Concrete pumped into ICF wall forms and house slab cap (Teague Equipment)
|
20 October 2004 |
|
|
|
|
|
|
|
Wet curing blanket covers fresh slab to reduce cracks, add strength (ConKure) |
19 October 2004 |
|
|
|
|
|
|
|
Placing and finishing concrete slab cap over fill within stem wall foundation |
18 October 2004 |
|
|
|
|
|
|
|
Tape alerts other workers to maintain termite barrier |
16 October 2004 |
|
|
|
|
|
|
|
Steel mesh termite barriers secured on pipes before slab is poured (TemiMesh) |
15 October 2004 |
|
|
|
|
|
|
|
Wire mesh reinforcement for house slab cap |
14 October 2004 |
|
|
|
|
|
|
|
Durable vapor sheeting (Vapor Block) placed over fill within stemwall provides capillary break |
12 October 2004 |
|
|
|
|
|
|
|
Waterproofing top of stemwall to prevent water wicking up to slab (capillary break) |
11 October 2004 |
|
|
|
|
|
|
|
Teaching Center ICF and house stem wall foundation |
10 October 2004 |
|
|
|
|
|
|
|
Thank you to Lane Thompson, Eco-Block and LSU Construction Mngt.! |
7 October 2004 |
|
|
|
|
|
|
|
Concrete is pumped into reinforced foam forms |
6 October 2004 |
|
|
|
|
|
|
|
ICF walls, bracing, window and door bucks |
5 October 2004 |
|
|
|
|
|
|
|
Teaching Center ICF and house stem wall foundation |
4 October 2004 |
|
|
|
|
|
|
|
Securing steel rebar reinforcement to block connectors |
4 October 2004 |
|
|
|
|
|
|
|
ICF walls, bracing, window and door bucks |
3 October 2004 |
|
|
|
|
|
|
|
Applying adhesive to foam blocks |
3 October 2004 |
|
|
|
|
|
|
|
Insulating Concrete Form (ICF) foam blocks |
2 October 2004 |
|
|
|
|
|
|
|
LSU Construction students help build Teaching Center |
1 October 2004 |
|
|
|
|
|
|
|
Stemwall blocks filled with concrete |
9 August 2004 |
|
|
|
|
|
|
|
Stemwall will raise house 3 ft. above base flood elevation (18 in. higher than garage slab) |
8 August 2004 |
|
|
|
|
|
|
|
Top course trimmed to create form for slab cap |
7 August 2004 |
|
|
|
|
|
|
|
Block stemwall on house footings |
6 August 2004 |
|
|
|
|
|
|
|
Curing compound spayed on house footings; finished garage slab in background |
5 August 2004 |
|
|
|
|
|
|
|
Wet curing blanket (ConKure) placed to reduce curling, cracking |
4 August 2004 |
|
|
|
|
|
|
|
Finishing slab (garage Teaching Center) |
3 August 2004 |
|
|
|
|
|
|
|
Slab concrete placed over vapor barrier - low water to cement ratio |
2 August 2004 |
|
|
|
|
|
|
|
Concrete pumped into footing trenches (house) |
1 August 2004 |
|
|
|
|
|
|
|
Claudette Reichel (LaHouse chair) shares State of LaHouse vision at Entergy Reception |
1 July 2004 |
|
|
|
|
|
|
|
Roy Domangue (builder) sharing his perspective at Entergy reception |
1 July 2004 |
|
|
|
|
|
|
|
Trula Remson (architect) expressing purpose at Entergy Reception |
1 July 2004 |
|
|
|
|
|
|
|
Renae Conley (Entery President) thanked by LSU President Jenkins |
1 July 2004 |
|
|
|
|
|
|
|
Entergy honored at Diamond Key Reception |
1 July 2004 |
|
|
|
|
|
|
|
Post tension cables for slab crack control on expansive soils |
5 June 2004 |
|
|
|
|
|
|
|
Durable vapor barrier under slab and grade beams |
4 June 2004 |
|
|
|
|
|
|
|
Termidor soil treatment under slab (garage) |
3 June 2004 |
|
|
|
|
|
|
|
Piping rough-in - copper fittings without torch |
2 June 2004 |
|
|
|
|
|
|
|
House foundation footings - forms and rebar reinforcement |
1 June 2004 |
|
|
|
|
|
|
|
LaHouse Team Complete |
1 May 2004 |
|
|
|
|
|
|
|
Green Key Contributors honored |
1 July 2003 |
|
|
|
|
|
|
|
Bronze Key Contributors honored |
1 July 2003 |
|
|
|
|
|
|
|
Silver Key Contributors honored |
1 July 2003 |
|
|
|
|
|
|
|
Gold Key Contributors honored |
1 July 2003 |
|
|
|
|
|
|
|
Platinum Key Contributors honored at groundbreaking |
1 July 2003 |
|
|
|
|
|
|
|
100+ Supporters celebrated grounbreaking |
1 July 2003 |
|
|
|
|
|
|
|
Groundbreaking Reception on site |
1 July 2003 |
|
|
|
|
|
|
|
Groundbreaking Ceremony |
1 July 2003 |
|
|
|
|
|
|